Yuma Road Traffic Signals Design-Build

Yuma Road DB

Roadway Electric and Designer AZTEC worked together with the City of Buckeye to develop plans and construct five new trombone-style intersections on Yuma Road. This included new ADA wheel chair ramps, striping, and relocation of existing light poles, boring of new conduit, installation of new fiber conduit and pull boxes between all intersections. Scope also included coordination… more

SR 303L – Peoria Avenue to Mountain View Boulevard CMAR

This CMAR project included the construction of four new complete traffic signals, 32 traffic signal loop detectors, 122 preformed loop detectors, 228 new street lighting poles and luminaries, video detection camera systems, signing, and bridge under deck lighting. This project also included duct bank work with APS and City of Surprise Communications. Roadway Electric also provided cost… more

Springerville Generating Station LED Conversion

Springerville Generating Station

This LED Conversion project involves the replacement of existing HPS flood lights with a combination of LED high mast fixtures and LED floodlights on three 100’ high mast poles to increase lighting safety for the TEP coal yard. Scope will also include the installation two new 80’ high mast poles and LED high mast fixtures at their… more

Marina Heights Off-site Improvements

Marina Heights

This contract consisted of installing new modular style traffic signals at four entrances to the new State Farm buildings being constructed by Ryan Companies. Roadway Electric also installed new and relocated light poles through the corridor. Fiber optic backbone was installed between all signals and connected to the existing fiber system at both Scottsdale Road and Mill… more

ADOT – Sign Maintenance

ADOT Signing Maintenance

This maintenance contract consists of task order work to repair or replace existing signs that are damaged either by auto accidents or weather related storm damage.  MARKET: Maintenance LOCATION: Various Cities in AZ OWNER: ADOT DELIVERY METHOD:JOC

ADOT – Lighting Maintenance Services

ADOT Lighting Maintenance

This maintenance contract consists of task order work including trouble shooting, repair of all malfunctioning lighting equipment, replacement of lamps and any parts needed to restore the lighting. Work included all damaged underground equipment, wire or conduit, poles and other equipment. LOCATION: Various Cities in Arizona OWNER: ADOT MARKET: Maintenance DELIVERY METHOD: Job Order Contract

City Of Mesa – Traffic Signal Maintenance Services

Mesa Traffic Signal Maintenance

This maintenance contract consists of task order work required to maintain the City traffic signal system. Task order work includes but is not limited to the installation or replacement of traffic signals, poles, wiring, signal mast arms, pedestrian signals, foundations, and boring. MARKET: Maintenance LOCATION: Mesa, AZ OWNER: City of Mesa DELIVERY METHOD: Job Order Contract

City of Phoenix – Streetlight Maintenance

City of Phoenix Streetlight Maintenance JOC

This maintenance contract includes the maintenance of over 52,000 APS fed City of Phoenix–owned street lights. Roadway Electric also provides emergency on-call services and installation of either knocked down poles or new streetlights as directed by the City.  MARKET: Maintenance LOCATION: Phoenix, AZ OWNER: City of Phoenix DELIVERY METHOD: JOC

Red Light Camera and School Zone Speed Camera Installation

Roadway Electric Red Light Camera

This project included the installation of various red light cameras and school zone speed cameras in Maricopa County. Scope included directional drilled underground conduit, poles, controllers, violation line installation, detectors, and signage. MARKET: Transportation LOCATION: Maricopa County OWNER: American Traffic Solutions DELIVERY METHOD: Bid-Build

Falcon Field Airport – Taxiway B Reconfiguration

This project included the removal and replacement of the existing taxiway lights, guard lights, and guidance signs with new LED lights and signs on Taxiway B at Falcon Field Airport. Work also the 4,900 feet of new conduit ductbank with conductors. Installations were done per the new FFA clearance standards.  MARKET: Aviation LOCATION: Mesa, AZ OWNER: City of Mesa… more

Scottsdale Airport – Bravo Taxiway Rehabilitation

This project included the removal and replacement of the existing taxiway lights, guidance signs with new LED lights, and signs on Taxiway Bravo at Scottsdale. Additional scope included 10,500 feet of new conduit ductbank with conductors. Installations were done per the new FFA clearance standards. MARKET: Aviation  LOCATION: Scottsdale, AZ OWNER: City of Scottsdale DELIVERY METHOD: Bid-Build

Deer Valley Airport – Taxiway Alpha Reconstruction

Deer Valley Airport

This project included the removal and replacement of the existing taxiway lights and signs with new LED lights and signs on Taxiway Alpha at Deer Valley Airport. Additional scope included the installation new obstruction lights, new regulators, 21,000 feet of new duck bank with conductors, and modifications to the existing ALCMS system. Installations were done per the… more

SR 202L (Red Mtn) – SR 101L (Pima) to Broadway Rd

SR 202L Red Mtn.

This Design-Build project involved the installation of 176 new median light poles, removal of 345 existing light poles from shoulder, and seven new DMS sign structures with signs. Work also included the installation of 14 new CCTV poles and cameras, loop detection throughout corridor, 110,000’ of new fiber backbone, and 18 relocated or new sign structures. Roadway… more

ADOT Statewide DMS – I-10, I-17, I-40, and SR 260

ADOT Statewide DMS

The project involved the installation of five new DMS sign structures and signs. Other scope consisted of the installation of asphalt maintenance pads at each location, guardrail protection, and wireless radio connection to ADOT.  MARKET: Transportation LOCATION: Various Cities in AZ OWNER: ADOT DELIVERY METHOD: Bid-Build

McDowell Road Commercial Corridor Infrastructure

McDowell Commerical Corridor

This project included the installation of 156 new street lighting poles and luminaries, and nine complete modular traffic signals. Additional scope included the installation of four miles of APS duct bank, signing, and 98 pedestrian lighting poles. MARKET: Transportation LOCATION: Goodyear, AZ OWNER: City of Goodyear DELIVERY METHOD: Bid-Build